Hallmark Tupelo ConcreteHallmark Tupelo Concrete

Concrete floor installation in Tupelo MS - a solid, dry base for what goes on top

Damp spots or a cracked, sunken slab? We pour a new floor on a packed base, planned around what goes on top.

Concrete steps lead up through a boulder border to a curved pool deck with a blue swimming pool and landscaped seating areas.
  • Licensed and fully insured.
  • Free on-site estimates.
  • We respond within 1 business day.

What goes into a new concrete floor in Tupelo?

Concrete floor installation in Tupelo is pouring a new slab inside a home addition, shop or other building, over a packed base and usually a moisture barrier, so the floor stays flat and the flooring you put on it later is protected from damp coming up out of the ground.

Most folks who call me about a floor are finishing a shop, an addition or a storage building, or they're tearing out an old slab that's been cracked and damp for years, and the first thing I ask is what's going on top of it. The price moves with the size of the floor, how much digging and base work the ground needs, and whether you want reinforcement and a moisture barrier, since both add to it. The schedule turns mostly on the weather on pour day and the wait before you can load the floor, and the estimate I write up spells out exactly what's included for yours.

How do you know your concrete floor needs replacing?

  • Damp spots or musty smell

    If carpet smells musty, a wood floor starts to cup or tile grout stays dark, moisture is usually coming up through an old slab that went in without a good barrier. The longer it goes, the more flooring and furniture you end up replacing along with the concrete.

  • Cracks that keep growing

    A hairline crack is normal, but a crack that widens or has one side higher than the other usually means the ground under the slab has moved. Waiting lets the edges break off and gives water more ways in.

  • A floor that dips or tilts

    When a ball rolls to one corner or a door starts dragging, that part of the floor has usually settled because the base under it was never dug out and packed. It tends to keep sinking, so patching the top only buys a little time.

How we handle concrete floor installation

I start with what's going on the floor, because tile, wood, vinyl and carpet all suffer from moisture coming up from below, and a bare shop floor doesn't care nearly as much. Then we dig out the soft dirt and pack the subgrade, the ground the slab sits on, because a floor can only stay as flat as what's under it. Before we order concrete, I go over the moisture barrier and the rebar, the steel that helps hold the slab together, and tell you what each one does for your floor and what it won't do. We pour, finish the top, and cut control joints, shallow grooves that give the slab a place to crack in a straight line instead of wherever it wants, and then it cures, which is the wait while the concrete gains its strength. If the budget gets tight, I'd rather you trim the finish than the base, because nobody sees the base on day one, but it's what decides whether the floor is still flat years from now.

  • Smooth troweled finish

    This suits rooms getting tile, vinyl, wood or a coating, since a flat, tight surface gives the flooring a good bed. Left bare, it can get slick, so it's a poor pick for a space that stays wet.

  • Broom finish for work spaces

    For a shop or barn floor that gets hosed down, a broom finish, the light texture dragged across the top, gives boots some grip. It's not the right surface for most flooring, so we only use it where the concrete stays bare.

  • Moisture barrier under the slab

    Any living space or room with flooring that minds damp should have one, which covers most of them. On a storage building that stays bare, it matters less, and I'll tell you so rather than sell you something you don't need.

Get a written estimate for your concrete floor

I answer the phone myself, and if I miss you, you'll hear back within one business day. Estimates are free, done on site and come with no obligation, and I'll write up exactly what's included.

(662) 990-8013
Based in
Tupelo, MS 38804
Hours
Mon–Fri: 6 AM–10 PM, Sat–Sun: 7 AM–11 PM

What happens when you call about a concrete floor in Tupelo?

Here's how a floor job runs from your first call to the day you walk across it, and what you'll have in hand along the way.

  1. Call and tell me the plan

    I'll set a time to come out, measure and hear what you have in mind for the space. It helps if you already know what flooring, if any, you want on top.

  2. Get a plain-words written estimate

    I write the estimate up so you can see exactly what's included, base work, barrier and reinforcement among it. You'll know what you're paying for before you decide anything.

  3. We prep the ground and pour

    Once you say go, we handle the permit paperwork with you, dig out and pack the base, and pour. Then the slab sits and cures before anyone puts real weight on it.

  4. Walk the finished floor together

    When we're done, I walk the floor with you and point out the control joints and anything worth keeping an eye on. I'll also go over how to look after it in the first few weeks.

Why Tupelo folks call Hallmark Tupelo Concrete for floors

  • I come out to every estimate

    I come out myself to look at the job and give the estimate, and my crew and I do the work together. You're talking to the person who'll be there on pour day, not passing messages through somebody else.

  • Pouring concrete here since 2017

    I left an office job to learn concrete on a crew here in north Mississippi, and I started this business in 2017, so that's 9 years of slabs. What I've cared about the whole time is the ground and the base, because that's what decides how a floor holds up.

  • Licensed and fully insured, every job

    We're licensed and fully insured. That means you aren't the one left holding the bag if something goes wrong while we're working on your property.

If you're planning a floor, send me the details here or call (662) 990-8013, and I'll come out and take a look.

Concrete floors, steps and slab work in Tupelo

Tupelo requires an approved permit from the city's Development Services department for any construction or land development in the city, so I check with them about your floor before we start, and when it needs a permit, we handle the paperwork with you. Every application needs a current recorded deed, plus a lease if the person applying isn't the owner, so it helps to have that handy.

The ground matters as much as the paperwork here. In a designated flood zone, the city says new development has to sit 2 feet above the flood elevation, and where there are suspect soils, it wants a soil engineer's report and 3 feet of fresh buildable fill to build on, so I want to know about either one before we plan the base. Even outside those spots, we run into soft, wet ground on plenty of lots, and we see the same thing on jobs in Pontotoc and New Albany, which is why we dig out and pack the base instead of pouring over whatever's there. We're based in Tupelo and work across the cities around it.

Questions about concrete floors in Tupelo

How much does a concrete slab cost in Tupelo?

A concrete slab in Tupelo usually runs about $5 to $11 per square foot, before any staining or stamping. That's the going rate around here, not a quote, and where your floor lands depends on its size, the ground work and what goes into it. I'll measure and write up your number on site.

Will my new concrete floor crack?

Probably a little, because even with the best design and careful work, a floor that never cracks or curls at the edges isn't realistic, and industry guidance says as much. The aim is small, tight cracks, mostly along the control joints we cut, and I'd rather tell you that now than promise something concrete won't do.

Does rebar keep a concrete floor from cracking?

No, reinforcement won't stop cracking, but when it's sized right and set in the right spot in the slab, the cracks that do show up should stay tightly closed. That's worth asking any crew about, and I'll walk you through how we've sized and placed it for your floor.

What is the best way to keep moisture from coming up through a concrete floor?

Industry guidance says flooring and coatings get the most protection when the moisture barrier sits right against the bottom of the slab. That takes some extra planning and care in how the floor goes in, so if you're putting down wood, vinyl or a coating, we'll settle it before the pour. The same guidance says the plain plastic sheeting used under a lot of older floors shouldn't be counted on for this anymore.

How long does a new concrete floor take before I can use it?

You should be able to walk on a new slab within 48 hours, it's safest to give it a week before heavier loads like a car or equipment, and full curing takes about a month. So plan to bring in light things first and the heavy stuff later.

What causes a weak, dusty surface on new concrete?

Usually the concrete dried out too fast while it was setting, and hot weather is the most common cause, mostly in summer, though it can happen any time of year. A windy, sunny day is harder on fresh concrete than a calm, humid one at the same temperature, and cooler days with dry air and wind can do it too, so I watch the forecast and pick the pour time with that in mind.

  • Concrete pool decks

    When the new room opens onto a pool, a deck poured to drain away from the house and give wet feet some grip makes the step outside easier.

  • Concrete steps construction

    A new floor often sits higher or lower than the old door threshold, and solid concrete steps give you an even, sturdy way in and out.

Service areas for concrete floors near Tupelo

Hallmark Tupelo Concrete is based in Tupelo, Mississippi, and pours floors across the cities around it. Five of those cities have their own page here, Booneville and Amory among them.

Tupelo, MS

Get your concrete floor estimate on paper

Have the floor's rough size in square feet and the property address ready when you call or fill out the form, so the first conversation covers what I need to plan the visit.